Revit services by freelance BIM modelers
In Revit, a busy architecture firm or an engineering firm moving to BIM can quickly need extra hands. Freelancers who know the software offer to model your BIM project, create your parametric families or produce your construction drawings. Others turn your DWG files into a 3D model or create your renderings. State your Revit version when you order: a model saved in a newer release no longer opens in an older one. Each Revit listing spells out the files you get, the cost and the schedule. Weigh the listings against each other, then book the one best suited to your building.
Are you a freelance Revit expert?
Sign up on BeFreelancr, create your profile and services, and find clients. Whether you're a freelancer, a collective or a Revit agency, your services are welcome!
Looking for a Revit freelancer?
Tell us about your project and we'll find the right provider (freelancer, collective or agency, depending on your needs). We'll suggest several profiles for you to talk to.
Revit: FAQ
Revit freelancer: how much does modeling or a set of drawings cost?
- Plan to draw or correct: €60 to €500, in 2 to 10 days.
- 3D modeling of a volume or a building element: €100 to €1,000, in 3 to 15 days.
A complete BIM model has no standard price. It varies with the floor area, the number of disciplines and the level of detail required. Have one typical floor of the building priced before extending the job to the whole model: this trial quickly reveals gaps in the estimate.
Which Revit version should you specify before ordering?
Yours, exactly. Autodesk says it plainly: Revit models are not backward compatible. Once upgraded and saved, a file can no longer be read by the earlier version, and the same rule applies to families and templates.
An IFC export, linked into the older version, at best lets you view the model without really editing it. So have the version number written into the order, and check it as soon as you receive the files, families included.
What should you specify to have a BIM model built in Revit?
- Its purpose: presentation, coordination between trades, quantity takeoffs or construction.
- The level of detail for each element type, without demanding the highest level everywhere.
- The disciplines: architecture, structure, MEP.
- The project's BIM conventions: naming, shared coordinates, template.
- The deliverables: RVT, IFC, DWG, PDF, views and schedules.
An overly detailed model costs more and becomes heavy to work with. Describe what the model must allow you to do rather than how many objects you want. For several disciplines at once, a collective or an agency on BeFreelancr can bring together skills that one person doesn't always have.
Can an existing building be modeled in Revit from drawings or a scan?
Yes, from DWG or PDF drawings, surveys, photos or a point cloud. Drawings don't turn into a model by themselves: they serve as a background on which walls and floors are traced again. A point cloud is linked in RCP or RCS format, after conversion in ReCap if it comes in another format.
The model will never be more accurate than the source data. With an old drawing, have the main dimensions checked on site, and state the tolerance you expect.
When should you order parametric Revit families?
When the same element comes back in your projects in several sizes or finishes: doors and windows, furniture, technical equipment. A well-built family saves you from modeling it again, provided its parameters match the way you work.
Provide the manufacturer's data sheet or a dimensioned sketch, the list of parameters and what must appear in plan and section views. Ask for a test in your template, because an overloaded family slows down the whole model.
Revit or AutoCAD: which one should you ask for on your project?
A single plan, a technical detail or a quick fix are often simpler in AutoCAD. Revit makes sense when plans, sections and elevations must stay linked to one model, or when several parties share the building model.
If an engineering firm is involved, ask which format it expects before ordering. Moving from 2D drawings to a model later means modeling the project all over again.